East Bradford Supervisors review 2027 budget plans, discuss hydrant and library taxes
Board of Supervisors Budget Meeting · Wed, August 19, 2026
Summary prepared by WCBN from the official minutes
WCBN uses AI to assist with certain tasks in preparing these summaries. Recaps may contain errors. Always check against the official source linked within each summary. See an error? Email hello@westchesterbythenumbers.com
Summary
At a special budget meeting, the East Bradford Board of Supervisors unanimously adopted Resolution 20-2026, authorizing staff to sign documents for grant funding for the Ravine Road Bridge and stabilization projects. Staff then walked the Board through proposed 2027 spending on parks and trails, roads and bridges, vehicles and buildings, public services and technology. The Board expressed general support for a dedicated hydrant tax and a dedicated library tax, and asked the Director of Finance to look into both. The Board did not express support for raising the Darlington Ridge sewer capital reserve fee at this time.
Key Discussion
- Grant resolution: Supervisor Bruce W. Laverty moved to adopt Resolution 20-2026, designating Township Manager Mandie Cantlin and Director of Finance Peggy Lennon to sign documents for DVRPC retro-reimbursement grant funding for the Ravine Road Bridge and stabilization projects. Chair Jeff Huckabee seconded, and the motion passed unanimously without discussion.
- East Bradford Park redevelopment: Construction is expected to start in 2028, with a preliminary cost estimate of $1,825,000 for upgrades to tennis courts, parking lots, pathways, playgrounds, the scoreboard and other amenities. The Township has received $175,000 from Chester County. Property and Recreation Director Rich Phifer recommended budgeting $35,000 in 2027 for accessibility design work.
- Copeland Park: Mr. Phifer recommended $10,000 in 2027 to replace one water fountain (the other will be taken out of service), $15,000 toward acquiring a trail easement, with trail construction expected in 2028, and $4,000 for new sod and Diamond Tech.
- Plum Run Corridor: Most of Phase I (Strode's Barn / Cannon) will be finished in 2026, with $1,050,000 budgeted from the Open Space Fund and $400,000 from the Capital Fund. Phase II is being prepared for bidding, with construction expected in 2027 at about $671,000. West Chester University will contribute $96,000 and DCNR has awarded $315,500; the Township expects to pay about $270,000, depending on bids.
- Other trails and parks: The Township expects to spend about $72,000 in 2026 on Blackhorse Run Trail design, with construction planned for 2028 and nothing budgeted for 2027. The Board will look at sample park signs on September 10; $5,000 is budgeted for 2026 and the same amount would be budgeted for 2027.
- 2027 paving: Public Works plans to pave about 3.9 miles, using about $365,000 from the Capital Fund and $425,000 from the Liquid Fuels Fund. Inlet repairs through a COSTARS vendor are estimated at $110,000. Public Works recommended raising the line-painting budget from $25,000 to about $40,000 to include signalized intersections.
- Road and stormwater projects: Township Engineer Mark Lucas has asked Carroll Engineering for a design proposal for the failing stormwater system on Cynthia Lane (design about $25,000; construction about $350,000 in 2027). He recommended $15,000 for design and $250,000 for construction on Harmony Hill Road, where a Watershed Restoration and Protection Program grant is pending. Staff recommended $15,000 to extend stormwater piping on Ravine Road.
- Sunset Hollow Bridge: Of $265,000 budgeted for 2026, only $65,000 is expected to be spent. The project is ready to bid but is on hold until LSA funding is announced; the remaining $200,000 will roll over to 2027.
- Vehicles and buildings: The Township plans to set aside $210,000 in 2027 for a replacement Ram pickup, a replacement mower and a new batwing mower. Staff recommended $20,000 for general building repairs and raising the Copeland Schoolhouse restoration line to $100,000 after recent bid results. About $1,800,000 is planned for property-related work for future Township campus development.
- Public services: The Township gives about $32,000 a year to the West Chester and Downingtown libraries and has committed $20,000 a year from 2027 through 2031 to the Downingtown Library capital campaign. Ms. Cantlin recommended budgeting $40,000 for a consultant to help rebid the refuse and recycling contract; estimates so far range from about $12,000 to about $100,000. Joining a regional refuse and recycling study would cost about $18,000. The Township has agreed to contribute $20,000 in 2027 to the West Chester Regional Township Fire and EMS Coalition.
- Truck scales: There has been recent discussion about partnering with West Chester Borough to buy truck scales for about $15,000, with fines for overweight vehicles offsetting the cost. Ms. Cantlin will discuss the idea with the Police Department.
- Technology: The Township plans to move forward with Vialytics road scanning technology; the Board will discuss phasing and timing on September 10.
- Revenue options: The Township is responsible for 225 fire hydrants, and water service for them is expected to cost more than $87,000 in 2027. The Board expressed general support for a dedicated hydrant tax and for a dedicated library tax. The Board did not express support for raising the Darlington Ridge sewer capital reserve fee from $125 per quarter to the $152 recommended in a 2025 study.
Action Items
- Director of Finance Peggy Lennon will look further into a dedicated hydrant tax and a dedicated library tax.
- The Board will consider sample park signs and discuss Vialytics phasing and timing at its September 10, 2026 meeting.
- Ms. Cantlin will refine the refuse and recycling consultant estimate over the next month and discuss truck scales with the Police Department.
- Next meeting: Regular Board of Supervisors meeting on September 10, 2026, at 6:30 p.m.
Votes at This Meeting
How we record votes: We record votes of governing boards only (borough council, boards of supervisors, the school board and county commissioners), from the meeting recording or the official minutes. When a voice vote has no audible dissent, we list every member present as voting yes; attendance comes from the roll call. Routine procedural motions may be grouped or left out. Votes taken from recordings are marked Provisional until we check them against the official minutes, which are the official record; if the minutes differ, we correct the vote to match. This record covers only meetings WCBN has recapped and is not a complete voting history. See an error? Email hello@westchesterbythenumbers.com
- From official minutesRes. 20-2026Passed
Authorize staff to sign DVRPC grant documents
Contract
Yes: Jeff Huckabee, Bruce W. Laverty, Debbie MaynardNo: —Abstain: —Absent: —Recorded from the official minutes.