The Planning Commission recommended that the Board of Supervisors approve, with conditions, a landscape design studio at 1032 and 1036 Wilmington Pike; one member opposed. Commissioners reviewed open issues on a plan to turn the former TD Bank in the Westtown Village Shopping Center into a Dunkin with a drive-through, including curb ramps and lighting; the applicant plans to return in December. A Turks Head Trail Alliance representative said the Delaware Valley Regional Planning Commission has agreed to do a feasibility study for the proposed 9.29-mile trail.
Meeting Details
Crebilly Preserve master plan meeting minutes
Watch at 04:30- A commissioner said minutes from Crebilly Preserve master plan meetings, cited at the last meeting, could not be found on the township website.
- Township staff said they are waiting for the planning consultant team to send those minutes and will post them when received.
Dunkin drive-through at 1159 Wilmington Pike
Watch at 06:08- The owner proposes turning the former TD Bank in the Westtown Village Shopping Center into a Dunkin with a drive-through and a reworked parking lot.
- The applicant's engineer said the zoning hearing board already granted a variance and a special exception; land development is needed to record the shopping center as one property.
- The applicant asked for waivers on landscaping and lighting; the township engineer asked for a landscaping table, and the applicant agreed to provide a lighting plan.
- Sewer use, water supply confirmation from Aqua, a traffic study and a requested waiver from offering road right-of-way along the state highways are still being worked out.
- Outcome: no action; the applicant said it would not ask for a vote and plans to resubmit and return in December.
Curb ramps and drive-through layout at the Dunkin site
Watch at 25:36- The township traffic engineer recommended curb ramps where two sidewalks end at a curb near the building.
- The applicant's engineer objected because those sidewalks are steeper than ADA standards allow, and said accessible parking and a new ramp serve the building entrance.
- Commissioners disagreed: some said ramps are needed for barrier-free access, others called ramps to nowhere excessive; staff said the building code review may require accessible routes anyway.
- The traffic engineer also suggested a raised separator at the order board and pavement marking changes near the drive-through exit; the applicant prefers striping.
- Outcome: no agreement on the curb ramps; no action taken.
Turks Head Trail project overview
Watch at 48:34- A Turks Head Trail Alliance representative presented the proposed trail from West Chester Borough to the Wawa SEPTA station, running beside the West Chester Railroad on SEPTA-owned land.
- The presenter said about 1.75 miles would be in Westtown, and the Delaware Valley Regional Planning Commission, working with Chester County, agreed to do a feasibility study, possibly starting next July.
- The presenter said SEPTA declined in 2022 but wrote a letter of support for the feasibility study in 2026, and the study costs municipalities nothing.
- Commissioners asked about crossings at Oakbourne Road and Route 926, access near Rustin High School, links to neighborhoods, stream crossings and passenger rail restoration.
- A commissioner asked that Westtown not have to pay for the trail because the township already carries a 30-year mortgage on Crebilly; the presenter said the alliance will seek grants and donations.
- Outcome: presentation only; no action taken.
Landscape design studio at 1032 and 1036 Wilmington Pike
Watch at 01:16:39- The applicant proposes a 5,888-square-foot landscape design building, display areas, parking and a pool area, with sewage held in holding tanks and no driveway onto Cheney Drive.
- The township engineer said stormwater calculations and the Cheney Drive right-of-way line still need to be resolved; an old 1967 plan suggests the right-of-way may extend further into the site.
- The township traffic engineer and one commissioner favored access from Cheney Drive under the ordinance; most commissioners accepted keeping the existing Wilmington Pike driveways.
- The township sewer engineer said a permanent holding tank for new construction is unusual and needs state DEP approval; the township could require maintenance contracts and alarms.
- The property owner said the owner would not take responsibility for an existing 18-inch pipe under Route 202; commissioners supported waiving its evaluation.
- Outcome: recommended approval to the Board of Supervisors with conditions, with one member opposed.
Conditions and waivers for the landscape studio recommendation
Watch at 01:51:18- Conditions include a plan note offering any needed right-of-way for dedication, a PennDOT highway occupancy permit, and county health, DEP and township approval of the holding tanks.
- Other conditions: a plan note to connect to public sewer if it ever becomes available, holding tank monitoring per the sewer engineer, survey resolution, and compliance with review letters.
- Commissioners recommended all ten waiver requests; one commissioner opposed the waivers to keep the Wilmington Pike driveways and skip widening Cheney Drive.
- A commissioner raised preserving the existing house since no historical study is required; the applicant's side said it will fix up the house but did not agree to an easement.
Other business
- Two old business items, a parking item and a roles and responsibilities item, were deferred.
- The next Planning Commission meeting is December 9 at 7 p.m.
Action Items
- Dunkin applicant to resubmit plans and return for a recommendation at the December meeting.
- Board of Supervisors to consider the landscape studio plan for 1032 and 1036 Wilmington Pike with the commission's conditions.
- Landscape studio applicant and township engineer to resolve the Cheney Drive right-of-way survey discrepancy.
- Turks Head Trail feasibility study by the Delaware Valley Regional Planning Commission expected to start next summer.
- Next Planning Commission meeting: December 9 at 7 p.m.
Votes at This Meeting
How we record votes: We record votes of governing boards only (borough council, boards of supervisors, the school board and county commissioners), from the meeting recording or the official minutes. When a voice vote has no audible dissent, we list every member present as voting yes; attendance comes from the roll call. Routine procedural motions may be grouped or left out. Votes taken from recordings are marked Provisional until we check them against the official minutes, which are the official record; if the minutes differ, we correct the vote to match. This record covers only meetings WCBN has recapped and is not a complete voting history. See an error? Email hello@westchesterbythenumbers.com
No recorded votes for this meeting.